IT Infrastructure Modernization

Ecogen modernized the infrastructure behind its 52 plants with PWS Cloud and saved up to 40%, without stopping operations.

Industry
Energy · energy transition
Size
52 plants, half in remote locations
Cutover
about 2 hours, with VMs replicated beforehand
Solution
Cybersecurity
Team following a cloud strategy project.
  • up to 40%savings on infrastructure and licenses
  • ~100%availability with remote plants (from 80–90%)
  • 20–25 hper week freed up for the IT team
  • 2 hfinal cutover window

A planned journey for a more resilient operation

Evolução de maturidade

Professional working on a managed cloud project.

On video

Results achieved with the project

  • 01

    More predictable digital operations

    The environment gained clearer routines, technical visibility, and better operational control.

  • 02

    Reduced risk during the transition

    The project was executed in stages with validation checkpoints and specialized support.

  • 03

    A stronger foundation for future initiatives

    The company now has a more scalable and governed base for digital evolution.

What supported the project

  1. Technical planning

    Application mapping, dependency analysis, and migration stages designed to reduce risk.

  2. Assisted execution

    Specialists supporting validation, transition, and post-project stabilization.

  3. Tailored architecture

    A cloud foundation designed around the operation and its growth goals.

  4. Continuous governance

    Ongoing monitoring to preserve availability, security, and platform evolution.

The point was not only moving to cloud. It was doing it with confidence, without stopping the business, and with a team close enough to support each decision.
Rafael Lima
Technology leader - NovaSeg

Solutions in this case

Other cases

Want results like these in your operation?